Image of County of El Dorado

Home > Government > Planning
APPLICATION STATUS
Saturday ,  February   16 ,   2019   5:58:31 PM


Project DR 14 0005  - DOLLAR GENERAL GEORGETOWN   
Project Type DESIGN REVIEW Status:  [Definitions] APPROVED
Planner ROBERT PETERS   District Supervisor: LORI PARLIN
Plan Area NONE SPECIFIED      
Number of Lots Vicinity Map: Not Available at this time  
Project Description DESIGN REVIEW FOR A PROPOSED 9,100 SQ FT DOLLAR GENERAL RETAIL BUILDING. THE PROJECT IS LOCATED WITHIN A HISTORIC DESIGN REVIEW AREA. BLA14-0055 IS BEING PROCESSED CONCURRENTLY TO MERGE THE THREEPARCELS PRIOR TO BUILDING PERMIT APPROVAL.  
Project Location SOUTHEAST SIDE MAIN STREET BETWEEN INTERSECTIONS WITH ORLEANS STREET AND HARKNESS STREET IN THE GEORGETOWN AREA.  
Situs 6322  MAIN  ST
APN(s) 061-362-01-100   061-362-02-100   061-362-04-100    
Related Projects BLA 14 0055    DR 14 0005 A   DR 14 0005 A    

Related Documents:
10/28/2015
PUBLIC NOTICE - Notice of Decision
10/28/2015
REVISED DRAFT Staff Report
9/11/2015
PROPOSED Mitigated Negative Declaration and Initial Study
9/11/2015
DRAFT Staff Report
8/26/2015
REVISED 06-03-15_Plans-Site, Signage, Lighting, Floor, Elevations, Landscaping
8/26/2015
Color Elevations
8/26/2015
REVISED 06-03-15_Improvement Plans
8/26/2015
Alternative Site Plan 1
8/26/2015
Alternative Site Plan 2
8/26/2015
Supplemental Drainage Letter
8/26/2015
Letter Regarding Public Concern-Biological Resources
8/26/2015
Feasibility of New Site Plan Options Letter
8/26/2015
New Site Layout Incompatibility with Septic Design Letter
4/16/2015
REVISED_Plans_ Site, Signage, Lighting, Floor, Elevations, Landscaping
4/16/2015
HAP Historical Architecture Memo
4/16/2015
REVISED_Improvement Plans
4/16/2015
REVISED_Preliminary Drainage Report
4/16/2015
Stormwater Polution Prevention Plan
4/16/2015
Structural Calculations Retaining Walls
4/16/2015
REVISED_Traffic Analysis
4/16/2015
REVISED_Septic System _Feasibility Study
4/16/2015
Domestic Waste Water Disposal System
4/16/2015
Environmental Noise Assessment
4/16/2015
Economic Analysis
4/16/2015
Nationwide PCN Form, Cultural Report (Redacted), Wetland Delineation, and Biological Report
4/16/2015
Wetland Delineation Map
4/16/2015
SWRCB Fee Statement
4/16/2015
SWRCB NOI
3/31/2015
Geotechnical Engineering Investigation
3/3/2015
Initial Consultation Materials
3/3/2015
Project Materials
3/3/2015
Building Colors and Finishes
3/3/2015
Improvement Plans
3/3/2015
Preliminary Drainage Report
3/3/2015
Biological Report and Appendix
3/3/2015
Mitigation Addendum_Wetlands
3/3/2015
Oak Tree Canapy Calculations
3/3/2015
Traffic Analysis and Appendix
3/3/2015
Truck Turning Templates
3/3/2015
AQ-GHG Analysis
3/3/2015
Septic System_Feasability Study
20215